North Carolina electrical license requirements and insurance

To work for yourself as an electrician in North Carolina, you need the Limited (L) electrical contracting license license. North Carolina has 4 electrical license types, and which one you need depends on the work you take on. The state sets no minimum liability insurance, and workers' comp is required once you have three or more employees on a regular basis.

Who it applies to

1Who needs an electrical license in North Carolina? What is this?

Limited (L) electrical contracting license: an electrical contractor whose single jobs stay small

LicenseWho needs itWhat it covers
Limited (L) electrical contracting licenseAn electrical contractor whose single jobs stay smallA single electrical contracting project worth no more than $60,000, where the equipment or installation in the contract is rated at no more than 600 volts
Intermediate (I) electrical contracting licenseAn electrical contractor taking mid-sized jobsA single electrical contracting project worth no more than $150,000. The 600 volt cap that applies to Limited does not apply here
Unlimited (U) electrical contracting licenseAn electrical contractor who wants no ceiling on job sizeAny electrical contracting project, whatever it is worth
Special Restricted classificationsSomeone who only does one narrow kind of electrical work and does not want a full licenseOne limited phase of electrical contracting. You may not work outside the class you hold
Who runs it

2Who issues electrician licenses in North Carolina? What is this?

North Carolina State Board of Examiners of Electrical Contractors issues electrical licenses in North Carolina.

NameNorth Carolina State Board of Examiners of Electrical Contractors
Websitencbeec.org
Look up a licensearls-public.ncbeec.org
The lawNorth Carolina General Statutes Chapter 87, Article 4 (G.S. 87-39 and following)
The rulebookTitle 21 NCAC Chapter 18B

This is not the same board as the one for plumbing and heating contractors. Electrical has its own board, its own exam and its own renewal date.

Checked by a person against the official page
·2 official pages
Getting licensed

3How to become an electrician in North Carolina What is this?

North Carolina has 4 licenses that matter to an electrician: Limited (L) electrical contracting license, Intermediate (I) electrical contracting license, Unlimited (U) electrical contracting license, Special Restricted classifications. Each is below, with what you need before you apply.

LicenseExam
Limited (L) electrical contracting licenseYes, a board exam. You apply, pass, then apply again to obtain and activate the license
Intermediate (I) electrical contracting licenseYes, a board exam
Unlimited (U) electrical contracting licenseYes, a board exam
Special Restricted classifications—
What it costs

4How much does an electrical license cost in North Carolina? What is this?

The government fees on this page add up to about $225 in North Carolina. Add insurance, tools, and a vehicle to get the real number.

LicenseLate renewalYearly license feeApplication and examReplacement licenseReviewing your examProving your license to someone
Limited (L) electrical contracting license$25$100$125$15$25$25
Intermediate (I) electrical contracting license$25$150$125———
Unlimited (U) electrical contracting license$25$200$125———
Special Restricted classifications—$100$125———

Added up

Government fees, added up$225

Government fees only, for the smallest license. Intermediate is $150 a year and Unlimited $200. Does not include insurance premiums, tools, a vehicle, or city permits.

Our estimate
Insurance

5How much electrical contractor insurance do you need in North Carolina? What is this?

North Carolina sets no minimum liability insurance for this license. Customers and general contractors usually ask for $1,000,000 anyway. Workers' comp is required once you have three or more employees on a regular basis.

Minimum liability insuranceNone required by the state
Type of policyNone required by the state to hold the license
Who this applies toNobody. The board's fee and licensing pages set no insurance minimum for electrical contractors. Customers, builders, and some city permit offices will still ask for a certificate
Who must be named on the certificateNone
Workers' comp required?Yes, once you have three or more employees on a regular basis
Who can opt outCorporate officers count as employees toward the three but can exclude themselves from the policy in writing. Sole proprietors, partners, and LLC members are not counted and are not covered unless they choose to add themselves
Checked by software against the official page
·2 official pages
Money checks

6Does North Carolina check your credit for an electrician license? What is this?

North Carolina does not check your credit for this license.

Credit score you needNone found
Proof a surety would bond youFor an Intermediate or Unlimited license you must show a statement of bonding ability before the board will activate it. That is a surety's word that it would bond you, which in practice means your finances are looked at, even though the board sets no net worth figure and asks for no credit score

There is no credit check and no net worth test written into the board's pages. The bonding ability statement is the only money test, and it does not apply to a Limited license

Checked by a person against the official page·ncbeec.org
Bonds

7Does an electrician need a bond in North Carolina? What is this?

North Carolina requires a bond. A bond is a promise, backed by an insurance company, that customers can be paid if you do not finish the job.

Does the state require a bond?Yes
AmountNot listed yet
Who needs itThe Intermediate and Unlimited classifications only. A Limited license needs none
What you have to show
  • A statement of bonding ability, not a bond itself.
  • It is a statement from a surety that they would bond you, and the board has its own form for it.
  • No dollar figure is set on the board's page

The board asks for this to activate the license, not to sit the exam. Cities may also ask for a bond before they let you pull permits

Checked by a person against the official page·ncbeec.org
Federal rules

8Federal rules that also apply What is this?

Rules from the US government that apply to an electrician in North Carolina on top of the state's own.

Federal licenseNone. There is no federal license or card for electrical work
Lead-safe certification
  • Work that disturbs paint in a home or childcare building put up before 1978 is covered by the federal lead rule.
  • Electrical work is named in it.
  • Your firm must be EPA lead-safe certified and use a trained renovator.
  • Jobs that disturb six square feet or less of paint in a room inside, or 20 square feet or less outside, are left out
Checked by software against the official page·epa.gov
Showing your number

9Where must a North Carolina electrician show the license number? What is this?

In North Carolina: we found no rule saying where an electrical contractor's license number has to appear. The board's licensing page sets none.

The ruleWe found no rule saying where an electrical contractor's license number has to appear. The board's licensing page sets none
The optional patchThe board sells an iron-on Qualified Individual patch, 3.5 inches across, for $6. It is offered, not required

Ask your city building department. Some of them ask for the number on permits and on vehicles even where the state does not

Still being checked
·2 official pages
Tax

10Does an electrician charge sales tax on labor in North Carolina? What is this?

Whether North Carolina taxes your labor, your materials, or neither.

Repairs and service calls
  • You charge sales tax on the whole bill, labor and parts.
  • North Carolina taxes repair, maintenance, and installation services (the state calls them RMI).
  • Fixing a leak, replacing a toilet, sink, tub, shower, or fittings, and repairing, installing, or replacing a water heater are all taxable
Homes versus businessesNo difference. A home and a business are taxed the same way
New buildings and additions
  • No tax charged to the customer.
  • New construction and new additions to a piping system that need a building permit are capital improvements (the state calls the job a real property contract).
  • You pay sales tax yourself when you buy the materials and do not charge the customer
Materials on work that becomes part of the buildingYou are the consumer. Pay tax at the supply house and build it into your price. Keep a Form E-589CI (Affidavit of Capital Improvement) on file for each job
Materials on taxable repairsYou charge the customer tax on the parts as part of the taxable bill. Whether you can buy those parts tax-free with a resale certificate (Form E-595E) was not confirmed by the state's page
Jobs that are part repair, part new workIf the taxable repair part of a capital improvement job is 25 percent or less of the contract price, treat the whole job as a capital improvement. If it is more than 25 percent, charge tax on the repair part
Tax rate4.75 percent state plus local rates, for a total of 6.75 to 8.25 percent depending on the county
Getting paid

11Getting paid: lien and notice deadlines for a North Carolina electrician What is this?

If you are not paid in North Carolina, a lien on the property is your backstop, but only if your notice goes out on time: within 15 days after your first day of furnishing labor or materials (first day on site March 1 means notice by March 16). Miss it and your lien ranks behind any mortgage recorded before you file, and on some projects you cannot perfect a lien at all. Send it through the lien agent's approved website, certified mail, email, fax, or hand delivery.

The order things have to happen in, counted in days
  1. Day 0
    Your first day on the job

    The clock starts here.

  2. Day 120
    File your lien

    File a Claim of Lien on Real Property with the clerk of superior court in the county where the property is, within 120 days after your last day of furnishing labor or materials (last day April 1 means file by July 30)

Each day count is counted from the day the rule beside it names, which is not always the same day. Read the sentence under each one.

Who has to send a notice
  • Anyone who could file a lien, including the contractor hired by the owner, on a project where a lien agent is required.
  • A lien agent (a title company the owner picks to receive lien notices) is required when the project costs $40,000 or more.
  • It is not required for work on an existing single-family home the owner lives in
Send your notice to the lien agent by
  • Within 15 days after your first day of furnishing labor or materials (first day on site March 1 means notice by March 16).
  • Miss it and your lien ranks behind any mortgage recorded before you file, and on some projects you cannot perfect a lien at all.
  • Send it through the lien agent's approved website, certified mail, email, fax, or hand delivery
Notice when you are a subcontractorIf you were hired by the contractor, not the owner, you serve a Notice of Claim of Lien upon Funds on the person who owes your customer money. The statute sets no deadline for it, but nothing is protected until it is served.
File your lien byFile a Claim of Lien on Real Property with the clerk of superior court in the county where the property is, within 120 days after your last day of furnishing labor or materials (last day April 1 means file by July 30)
Keeping it

12How do you renew an electrical license in North Carolina? What is this?

The Limited (L) electrical contracting license renews every year. The license expires one year after the day it was issued, and the board sends a renewal notice about 60 days before.

LicenseRenewal
Limited (L) electrical contracting licenseEvery year. The license expires one year after the day it was issued, and the board sends a renewal notice about 60 days before
Intermediate (I) electrical contracting licenseEvery year, one year from the day the license was issued
Unlimited (U) electrical contracting licenseEvery year, one year from the day the license was issued
Special Restricted classificationsEvery year, one year from the day the license was issued

Renewal fees are in what the license costs. The official page for each license is linked under how you get it.

Watch out

13What catches people out in North Carolina What is this?

The things people get wrong or do not expect about North Carolina, in a few sentences.

  • Electrical has its own board. Plumbing, heating and fire sprinkler share one board; electrical contractors answer to a different one, with different rules and a different renewal date.
  • Your license class is set by the size of a single job, not by your skill. Limited stops at $60,000, Intermediate at $150,000, Unlimited has no ceiling.
  • Limited carries a second limit that catches people out. The equipment in the contract cannot be rated above 600 volts, whatever the job is worth.
  • There are seven Special Restricted classes for people who only do one thing, such as fire alarm, swimming pools, signs or elevators. Each costs $100 a year.
  • Licenses expire one year after the day they were issued, not on a fixed date, so no two contractors renew together.
  • The state sets no insurance minimum to hold the license. Customers, builders and city permit offices will still ask for a certificate.

14Where these numbers come from

The labels under each table are explained on how to read a page.

  1. ncbeec.org/licensing/
  2. ncbeec.org/fees-services/
  3. ncbeec.org/g-s-87-43-electrical-contractors-licensing-law/
  4. ncbeec.org/
  5. ncbeec.org/title-21-ncac-18b/
  6. ic.nc.gov/wcinsrqmt.html
  7. epa.gov/lead/renovation-repair-and-painting-program-contractors
  8. ncdor.gov/taxes-forms/sales-and-use-tax/taxable-items/real-property-contracts/services-real-property-taxability-chart
  9. ncdor.gov/taxes-forms/sales-and-use-tax/taxable-items/repair-maintenance-and-installation-services-and-other-repair-information
  10. ncdor.gov/taxes-forms/sales-and-use-tax/real-property-contracts
  11. codes.findlaw.com/nc/chapter-105-taxation/nc-gen-st-sect-105-164-4h/
  12. ncdor.gov/taxes-forms/sales-and-use-tax/sales-and-use-tax-rates/current-sales-and-use-tax-rates
  13. codes.findlaw.com/nc/chapter-44a-statutory-liens-and-charges/nc-gen-st-sect-44a-11-1/
  14. codes.findlaw.com/nc/chapter-44a-statutory-liens-and-charges/nc-gen-st-sect-44a-11-2/
  15. codes.findlaw.com/nc/chapter-44a-statutory-liens-and-charges/nc-gen-st-sect-44a-12/
  16. codes.findlaw.com/nc/chapter-44a-statutory-liens-and-charges/nc-gen-st-sect-44a-19/
  17. ncleg.gov/EnactedLegislation/Statutes/HTML/ByArticle/Chapter_44A/Article_2.html